Saturday, April 18, 2015

Busy week

Posting will be erratic this month and next. We are replacing our roof which has been overcome by rust. And we are replacing the coco lumber roof structure with iron. As I used to say  to everyone at the office, I plan to reach 100. I hope the all-metal roof will last that long too.

I thought I could spend the off-school months reading my books and posting typos. But I am busy procuring the materials and working on the electrical system.

I finally found out that there are four-way switches in the stores. I thought they are not yet available locally. It costs more than 400 pesos a piece; the Panasonic one that I got for testing. Many of our present lamps are controlled from two locations. A few of my new lighting system will be controlled from three locations. Hence the need for 4-way switches.